Pipe bridge – Steam & service pipework for Glenavy Dairy Factory. Pipework leaving the Wallace & Cooper workshop on transporter.
A long time client of Wallace & Cooper, the Tomi Maru receives factory changes, regular ship maintenance & ship repair work which include winch drums and refits. Wallace & Cooper have also designed and installed a lifting davit to enable easy loading and unloading of their man-overboard boat.
Wallace & Cooper Ltd constructed two tanks for Oceana Gold as part of their tailings upgrade project.
Fire protection upgrade; installation of a ring main and pipework. Manufacture of walkway, support frame and foam concentrate tank.
Previous
Next
Tanks & Pipe Work
Gantry upgrade and automation project at the B P Terminal, Dunedin.
Pipe bridge – Steam & service pipework for Glenavy Dairy Factory. Pipework leaving the Wallace & Cooper workshop on transporter.
Wallace & Cooper Ltd constructed two tanks for Oceana Gold as part of their tailings upgrade project.
Previous
Next
Maintenance & Installation
Fire protection upgrade; installation of a ring main and pipework. Manufacture of walkway, support frame and foam concentrate tank.
Installation of pump house includes complete installation of pumps & pipework at Highbank.
Previous
Next
Marine
A long time client of Wallace & Cooper, the Tomi Maru receives factory changes, regular ship maintenance & ship repair work which include winch drums and refits. Wallace & Cooper have also designed and installed a lifting davit to enable easy loading and unloading of their man-overboard boat.
Set of trawl winch motors & drums, overhauled in the Wallace & Cooper Hydraulics workshop, heading back to Nelson.
For many years Wallace & Cooper engineering have attended to Sanford’s ship maintenance which includes winch drum repairs and net roller repairs and maintenance.